Concrete Mix Ratios Explained: M10, M15, M20 and M25

Concrete grades such as M20 look like codes, but each one stands for a simple recipe of cement, sand and coarse aggregate. This guide shows what the grades mean, how many bags of cement a cubic metre needs, and how to estimate a real slab.

What the grade means

The letter M stands for mix and the number is the target compressive strength in megapascals after 28 days of curing. M20 concrete is designed to reach 20 MPa. For small and medium jobs, builders use nominal mixes: fixed volume ratios of cement : sand : aggregate that are known to achieve roughly that strength without laboratory design. Larger structural work uses a design mix prepared and tested for the project.

Nominal mixes and quantities per cubic metre

The table uses a dry-volume factor of 1.54 and 1,440 kg per cubic metre of cement (about 28.8 bags of 50 kg per cubic metre of loose cement).

GradeRatioCement bagsSand (m³)Aggregate (m³)Typical use
M101:3:64.40.460.92Blinding, levelling, mass fill
M151:2:46.30.440.88Footings, plain concrete, floors on grade
M201:1.5:38.10.420.84Slabs, beams, columns in houses
M251:1:211.10.390.77Heavier loads, water-retaining work

Always follow the grade your structural drawings call for. Foundations, columns and beams of habitable buildings are usually M20 or higher.

How the numbers are worked out

One cubic metre of finished concrete needs about 1.54 cubic metres of dry ingredients, because the loose materials contain voids that close up when mixed. For M20 (1:1.5:3) the total number of parts is 5.5, so cement is 1.54 × (1 ÷ 5.5) = 0.28 m³. At 1,440 kg per m³ that is 403 kg, or 8.06 bags. Sand is 0.28 × 1.5 = 0.42 m³ and aggregate is 0.28 × 3 = 0.84 m³.

Worked example: a 15 ft × 12 ft slab, 5 inches thick, M20

  1. Volume = 15 × 12 × 5/12 = 75 cubic feet = 2.12 m³.
  2. Cement = 2.12 × 8.06 = 17.1 bags.
  3. Sand = 2.12 × 0.42 = 0.89 m³ (about 31 cubic feet).
  4. Aggregate = 2.12 × 0.84 = 1.78 m³ (about 63 cubic feet).
  5. Add 5% for spillage and uneven sub-base: order about 18 bags, 0.94 m³ of sand and 1.87 m³ of aggregate.

Remember the steel: the Steel Weight Calculator converts bar diameter and length into kilograms, and the rebar weight guide explains the formula.

Water, workability and curing

Estimate your own job

The Concrete Calculator handles slabs, footings and columns, applies the dry-volume factor and returns cement bags, sand and aggregate. Use the Volume Calculator first if your shape is not a simple box.

Frequently asked questions

How many bags of cement are needed for 1 cubic metre of M20 concrete?

About 8 bags of 50 kg for a nominal 1:1.5:3 mix, together with roughly 0.42 m³ of sand and 0.84 m³ of aggregate.

Is a nominal mix as good as a design mix?

Nominal mixes are conservative and fine for ordinary houses. Large or heavily loaded structures need a design mix with tested materials, as specified by the engineer.

How long before I can remove formwork?

Typically 7 days for slab sides and 14–21 days for slab soffits, depending on span, weather and the engineer’s instructions.

Related tools and guides

These guides give general estimating methods. Always follow your engineer's drawings, local codes and the instructions of the material supplier.