A mix ratio such as 1:4 looks simple, but turning it into bags of cement and cubic feet of sand trips up many builders. This guide shows what the common ratios are used for, how a ratio becomes a shopping list, and the small factors that keep your estimate honest.
A ratio like 1:4 is cement : sand by volume. One part cement to four parts sand means five parts in total, so cement is 1/5 (20%) of the dry mix and sand is 4/5 (80%). The same logic applies to 1:5 (cement is 1/6) and 1:6 (cement is 1/7). The weaker the mix (the bigger the second number), the less cement per cubic metre and the lower the strength.
| Ratio | Typical use | Why |
|---|---|---|
| 1:3 | Waterproof plaster, damp-proof layers, pointing | Richer, denser and less permeable |
| 1:4 | External plaster, load-bearing brickwork, floor screed | Good strength and weather resistance |
| 1:5 | Internal plaster, general brickwork | Balance of cost and strength |
| 1:6 | Non-load-bearing partition walls, internal masonry | Economical where strength is not critical |
Local codes and engineers' specifications always come first. The table reflects common practice, not a substitute for your project's drawings.
Example: 0.1115 cubic metres of wet plaster (100 sq ft at 12 mm) becomes 0.1416 m³ dry. At 1:4 that is 0.0283 m³ of cement, about 0.82 of a bag, and 0.1133 m³ of sand, about 4 cubic feet.
Sand with too much silt or clay weakens mortar however carefully you measure. Good building sand is clean, sharp and well graded. Damp sand also "bulks": it takes up more volume than dry sand for the same weight, so a bucket measure of wet sand gives you less real sand than you think. Measure with the same container every time, and keep the sand covered so its moisture stays consistent.
Use the Brick Calculator for mortar in walls, the Plaster Calculator for wall and ceiling finishes, and the Concrete Calculator when you need aggregate as well. They apply the dry-volume factor and bag conversion automatically.
How many bags of cement are in 1 cubic metre of 1:4 mortar?
Dry volume is about 1.27 m³; cement is one fifth of that, 0.254 m³, which is about 7.3 bags of 50 kg.
Is 1:6 strong enough for brickwork?
It is widely used for non-load-bearing walls and internal work. Load-bearing walls and external work normally call for richer mixes such as 1:4 or 1:5, as specified by the engineer.
Why is the dry-volume factor needed?
Because cement and sand contain air when dry. Once they are mixed with water the voids fill, so you must start with more dry material than the finished mortar volume.