Ordering too few bricks stops the job; ordering too many ties up money you could have spent elsewhere. This guide explains how brick quantities are worked out, how many bricks go into a square foot of wall, and how to estimate the mortar that goes between them, with numbers you can check by hand.
Common burnt-clay bricks in Pakistan and India measure about 9 ร 4.5 ร 3 inches (roughly 230 ร 110 ร 70 mm). In the United States a "modular" brick is closer to 7โ ร 3โ ร 2ยผ inches. Whatever the size, a brick is never laid on its own: each one sits in a bed of mortar, usually about half an inch (10โ12 mm) thick, so the space a brick really occupies in a wall is its size plus one joint in every direction.
For a 9 ร 4.5 ร 3 inch brick with a ยฝ inch joint, the working size is 9.5 ร 5 ร 3.5 inches. That is 166.25 cubic inches, or 0.0962 cubic feet, per brick. Without mortar the brick itself is only 121.5 cubic inches (0.0703 cubic feet). The difference between those two numbers is the mortar, and it is the reason a wall needs fewer bricks than a simple "wall volume divided by brick volume" sum suggests.
The standard method has four steps:
Keep every length in the same unit before you multiply. Mixing feet and inches in one line is the most common source of wrong answers.
Using the 9.5 ร 5 ร 3.5 inch working size above, one face of a brick laid as a stretcher covers 9.5 ร 3.5 = 33.25 square inches. One square foot is 144 square inches, so a 4.5-inch thick wall (one brick width) takes about 3.9 bricks per square foot, or roughly 390 bricks per 100 square feet.
A 9-inch thick wall (two bricks deep) simply doubles that: about 7.8 bricks per square foot, or around 780 bricks per 100 square feet. Rules of thumb you may hear on site, such as "13 bricks per cubic foot", come from the same arithmetic with slightly different joint thicknesses, so small differences between sources are normal.
Wet mortar is not what you buy; you buy dry cement and sand. Dry materials contain air between the grains and shrink when mixed with water, so the dry volume is larger. A factor of 1.27 is commonly used: 40.4 ร 1.27 = 51.3 cubic feet of dry material.
| Mortar mix | Cement (cu ft) | Cement bags (50 kg) | Sand (cu ft) |
|---|---|---|---|
| 1:4 | 10.3 | 8.4 | 41.0 |
| 1:5 | 8.6 | 7.0 | 42.7 |
| 1:6 | 7.3 | 6.0 | 44.0 |
The bag figures use 1.226 cubic feet per 50 kg bag, which comes from a cement density of about 1,440 kg per cubic metre.
The BuildCostMate Brick Calculator performs all of these steps for you, including custom brick sizes, several walls at once, wastage on bricks and mortar, cement bags and sand. If you are building with hollow concrete blocks instead, use the Block Calculator, and for the concrete lintels and slabs around the wall try the Concrete Calculator.
How many bricks do I need for 1000 square feet of 9-inch wall?
Roughly 7,800 bricks before wastage (7.8 per square foot), or about 8,200 with 5% wastage, using a 9 ร 4.5 ร 3 inch brick and a ยฝ inch joint.
How much mortar goes into a brick wall?
About 25โ30% of the wall volume is mortar. In the 150 cubic foot example the mortar was 40.4 cubic feet, which is about 27%.
What wastage should I allow?
Five percent is a normal allowance for straightforward walls. Increase it for walls with many openings, curved work or poor-quality bricks that break easily.